PBX replacement
How to replace your hotel’s old PBX
We replace your hotel’s PBX, whatever the brand of the current one, and in most cases we keep the room phones and cabling.
- No room rewiring
- Rollback plan defined
- 24/7 support
When to replace it
Signs your PBX needs replacing
No more spare parts or support
When the manufacturer no longer gives support or spare parts, any failure can take days to fix.
Failures in peak season
A failure affects guest calls, wake-up calls, the front desk and call charging. Replacing it in time avoids dealing with a failure in peak season.
Limited PMS integration
If you changed PMS or want to connect it through FIAS, a new PBX makes it possible.
Changes only a technician can make
With AraManager your staff manages extensions, rooms and wake-up calls from the browser.
What you keep
What does not need to change
Phones and cabling
In most cases they connect to the new system through gateways, with no rewiring. Compatible with GPON fiber networks.
Your carrier
You keep your SIP provider, or we use your E1/T1 lines with a gateway.
Your PMS
The integration uses FIAS with the PMS you already use.
The process
Six stages, from review to follow-up
Survey
We review your current PBX, the PMS, the lines, the phones and the hotel network.
Proposal
We give you what is kept, what is replaced and the cutover plan.
Preparation
We configure the new system with your hotel data and test it before touching the current one.
Installation
We install the servers and gateways, and connect the PMS, the lines and the phones.
Cutover
We do the cutover in a window agreed with your hotel and test each room type and the operator line.
Follow-up
We train your staff on AraManager and give 24/7 support.
Questions
About replacing the PBX
Does the brand of my current PBX matter?
No. In the survey we review your PBX, your lines and your phones, and in the proposal we tell you what is kept and what is replaced.
Will we be left without phones during the cutover?
We prepare and test the new system before the cutover, so the hotel is without service for as little time as possible. We agree this in the cutover plan.
How long does the cutover take?
It depends on the size of the hotel, the lines and the PMS. We define it in the proposal.
What if something does not go as expected?
We define a rollback plan in advance, to go back to the current system if needed.