Migration process
How we replace your hotel’s PBX
Replacing a PBX should not interrupt your operation. These are the stages and what we need from you at each one.
Stages
Six stages, from survey to follow-up
Survey
We review your current PBX, the PMS, the lines, the phones and the hotel network.
Proposal
We give you what is kept, what is replaced and the plan for the change.
Preparation
We configure the new system with your hotel data and test it before touching the current one.
Installation
We install the servers and gateways and connect the PMS, the lines and the phones.
Cutover
We make the change in a window agreed with your hotel and test every room type and the operator line.
Follow-up
We train your staff on AraManager and provide 24/7 support.
What you keep
What does not need to change
Phones and cabling
In most cases they connect to the new system through gateways, with no rewiring.
Your phone provider
You keep your SIP provider, or we use your E1/T1 lines with a gateway.
Your PMS
The integration uses FIAS with the PMS you already use.
What we need from you
To get started
- A technical contact and a front-desk person for testing.
- The name, version and connection details of your PMS.
- The details of your phone provider and your lines.
- Access to the network and to the place where the equipment will be installed.
- A cutover window agreed with your operation.
Questions
About the change
Will we be without phones during the change?
We prepare and test the new system before the change, so the hotel is without service for as short a time as possible. We agree it in the plan for the change.
How long does the change take?
It depends on the size of the hotel, the lines and the PMS. We define it in the proposal.
What if something does not go as expected?
We define a fallback plan in advance, so we can go back to the current system if needed.
Demo
Request a demo
Tell us about your current PBX and we will contact you.